NetworkCore Contact us

Sandbox

Test your integration before going live. Simulated stations, no real energy, no real money.

  Sandbox Production
Base URL https://dp.networkcore.org https://dp.networkcore.org
Keys nc_test_ keys nc_live_ keys

Sandbox and production keys are separate. Ask your NetworkCore contact for yours. Sandbox data can be reset at any time.


Distribution Partners

Each test charge point is its own location, NC- plus its name, for example NC-SBX-OK. Each one behaves the same way every time.

Charge point What happens What you get
SBX-OK Normal charge. About 40 kWh in 30 minutes, stops when you call stop. PENDING → ACTIVE → COMPLETED with kwh and total_cost
SBX-REJECT Station refuses to start. 201 PENDING, then FAILED
SBX-BUSY Connector already in use. 409 CHARGE_POINT_OCCUPIED
SBX-TOKEN Driver can’t be authorized at the charging partner. 502 TOKEN_ERROR
SBX-DROP Driver unplugs after 1 minute. ACTIVE → COMPLETED without a stop call
SBX-LATE Final cost arrives 10 minutes after the session ends. COMPLETED with total_cost_status: ESTIMATED, then FINAL
SBX-HOLD Final cost is held for review. COMPLETED with total_cost: null and total_cost_status: IN_REVIEW
SBX-NOTARIFF No tariff available at start. 422 NO_TARIFF
SBX-MX Normal charge in Mexico City, priced in MXN. Same as SBX-OK
SBX-PLUG (coming soon) Car plugged in. Start without charge_point_id. Charge point detected: 201 PENDING, then same as SBX-OK
SBX-PLUG2 (coming soon) Two cars plugged in at once. Location NC-SBX-PLUG2 has two charge points. 409 CHARGE_POINT_NOT_DETECTED with two candidates. Send one with the same reference.

Also test on any charge point

Errors always look like this:

{ "error": { "code": "CHARGE_POINT_OCCUPIED", "message": "..." } }

Before going live

  1. Run every test station above and handle each result in your app.
  2. Share a test run with your NetworkCore contact.
  3. Switch to production keys and base URL.

Charge Point Operators

Connect your OCPI 2.2.1 test environment to our sandbox. We run the full flow against your CSMS.

What we test

  1. Credentials exchange (versions and details).
  2. Locations and tariffs sync.
  3. Status on plug-in: we plug in a vehicle without starting, and the charge point must turn BLOCKED or CHARGING within 10 seconds.
  4. Token push and authorization.
  5. START_SESSION and STOP_SESSION on a charge point you choose.
  6. Session updates while charging.
  7. CDR delivery, checked against your tariff.

Before going live

  1. All seven steps pass.
  2. We confirm the CDR totals match your tariff.
  3. Switch to production credentials.